405 scene, 7:06 a.m.

The north side of the bridge is coming down — here’s what it looked like just after 7 a.m. As for traffic, here’s the real-time map from Caltrans at 8:45 a.m. Lot of green is good!

405, 12:01 a.m.

The big equipment moving into place as the clock struck midnight on the 405 with work about to begin on the north side of the Mulholland bridge. It’s Carmageddon time!