Metro Orange Line Extension testing continues

Metro Orange Line Extension testing is now in its third week. Buses continue to run intermittently on their very own dedicated right-of-way between Canoga Station and the Chatsworth Metrolink/Amtrak Station. Metro reminds motorists, pedestrians and bicyclists to watch out for buses as they pass intersections to ensure a safe operation. [continue reading]

Transportation headlines, Monday, May 7

Here is a look at some of the transportation headlines gathered by us and the Metro Library. The full list of headlines is posted on the Library’s Headlines blog, which you can also access via email subscription or RSS feed. Rail capacity project launches (Caltrans) Caltrans, BNSF and Amtrak announced groundbreaking on a 3.8-mile section [continue reading]

Go Metro Weekends, May 4-6

Head to the Natural History Museum this Friday night for this month’s First Friday. The museum will stay open until 10 p.m. and offer a program of scientific discussion, a behind-the-scenes tour and live music. Tours this Friday start at 5 p.m. and feature “Lovely Bugs,” and the discussion at [continue reading]

Transportation headlines, Friday, May 4

Here is a look at some of the transportation headlines gathered by us and the Metro Library. The full list of headlines is posted on the Library’s Headlines blog, which you can also access via email subscription or RSS feed. Huizar, Living Streets, unveil parklet designs for El Sereno Ave., York Blvd. (L.A. Streetsblog) Two [continue reading]

Time-lapse video of construction of Iconic Bridge for Gold Line Foothill Extension

[youtube]http://www.youtube.com/watch?v=_-31REdmfq8&feature=youtu.be[/youtube] Very cool video released today of the ongoing construction work on the bridge that will carry Gold Line Foothill Extension tracks over the eastbound lanes of the 210 freeway in Arcadia. The project, funded by Measure R, is being built by the Gold Line Foothill Extension Construction Authority. The [continue reading]