The SR 100 Soilmec Drill Rig makes its way across the eastbound 210 last month to complete the foundations for two of the bridge’s three abutments.
The SR 100 Soilmec Drill Rig makes its way across the eastbound 210 last month to complete the foundations for two of the bridge’s three abutments.