Published July 5, 2011 at 467 × 348 in Construction scheduled to begin tonight on bridge over 210 for Gold Line Foothill Extension‘ATSF-Super-Chief-Arcadia-210-Frwy-Bridge-5-30-1971-467×348’ The Santa Fe Railroad’s Super Chief crosses the old bridge over the 210 freeway’s eastbound lanes in 1971. ‹ Back