Metro recommends technical study of two alternatives for Eastside Gold Line Phase 2
[scribd id=245046152 key=key-HuVGmBqo5tKvLRO1rulc mode=scroll] As many of you know, the draft environmental study for the Eastside Gold Line Transit Corridor Phase 2 project was released in August. Among the study alternatives being considered are extending the Eastside Gold Line from East Los Angeles to South El Monte and/or Whittier, as well as [continue reading]