710 project OKd but widening deferred
[scribd id=372736179 key=key-avLCDjC3TDdzoyIv6LcC mode=scroll] pdf here Alternative 5C was approved by the Metro Board of Directors on Thursday as the ‘locally preferred alternative’ for the I-710 Corridor Project along with [continue reading]