The 700-ft San Gabriel River Bridge structure was completed in time for the start of the official rainy season; an Army Corp of Engineers requirement.
The 700-ft San Gabriel River Bridge structure was completed in time for the start of the official rainy season; an Army Corp of Engineers requirement.