Published September 25, 2013 at 1920 × 2560 in Gold Line Foothill Extension update: concrete pours for another big bridge and grade crossings almost half complete!‘SG BR final deck pour (2) (2)’ The final concrete deck pour for the San Gabriel River bridge. ‹ Back