Below is the latest update from the Expo Line Construction Authority. For those interested, the More Than Red Cars blog already caught some photos of trains along Flower Street.
Categories: Projects
Below is the latest update from the Expo Line Construction Authority. For those interested, the More Than Red Cars blog already caught some photos of trains along Flower Street.
Categories: Projects
HAVE TESTED FROM PICO to LA CIENEGA/JEFFERSON STATION
EXPO LINE TRAIN TESTING
http://www.youtube.com/watch?v=sFX4D-m3Yf4
EXPO LINE TESTING ON FLOWER
http://www.youtube.com/watch?v=a9moKNFRmgI
EXPO LINE, TESTING STREET SIGNAL LIGHTS
http://www.youtube.com/watch?v=HPrcnnE_snk
First Running of Expo Line 2-Trains Side By Side
http://www.youtube.com/watch?v=-hX3I9tB2LY
EXPO LINE TESTING
http://www.youtube.com/watch?v=1xGLYAXkhVU
At the crossover junction of the Blue Line and Expo Line, who activates the track switching? Does the train’s motorman do that? Or is it activated by remote control? Or, is it fully automatic?
Hmm, “train control system”, I wonder if this means heavy signal prioritization or preemption. Lets hope so…