Published July 5, 2011 at 467 × 348 in Construction scheduled to begin tonight on bridge over 210 for Gold Line Foothill Extension‘Future-IFS-Location-41-467×348’ An aeriel rendering of the new bridge for the Foothill Extension. ‹ Back