Published July 20, 2018 at 640 × 480 in Double deckers, 210 barriers, Lyft/Uber: HWR, July 20‘Installation-of-plinth-rebar-in-the-SB-tunnel-v2’ Installation of plinth rebar for track placement in the southbound tunnel in the underground section of the line. ‹ Back